> This summer Mi Casa, Inc. hosted two Open House parties to celebrate the completion of one of our first new-construction projects.




From left to right: Shirley Boubert, Fernando Lemos (E.D. of Mi Casa), Ward 4 Councilmember Muriel Bowser, Holly Lennihan , Tamara King, and Idriys Abdullah (Mi Casa Board Members)



Side view from back entrance



Aisha Thompson (Mi Casa staff member) and Idriys Abdullah (Mi Casa Board Member)

Chef Jamie Forsythe entertains guests with bite-size hor’deurves throughout the events.


Faith Wheeler (ANC Member) and Jonathan Cohn (Mi Casa Board Member)



Front view of the two new properties

  


This summer we celebrated the completion of one of Mi Casa, Inc.’s first new-construction developments, the Rittenhouse Project. The project consisted of the construction of two 3-bedroom, 2 1/2-bathroom single-family homes to be sold at market and moderate income levels. Mi Casa, Inc. celebrated this achievement with two Open-House parties to share the homes with friends and supporters.



The completed Rittenhouse Project, two new single family homes in the Brightwood neighborhood.


At the Open House Party: Mayor Fenty celebrates with Mi Casa staff, as well as Leila Finucane-Edmonds, Director of DHCD, and Erik Johnson, Director of the
Home Again Program.






> Mi Casa En Español
   
Mi Casa, Inc. 6230 3rd Street, NW Suite 2 Washington, DC 20011 P: 202.722.7423 F: 202.722.7427